Bildschirmfoto 2014 01 29 Um 16 44 35

Postconflict School Reconstruction, Nunavil West GTMS School,

Hauri Ivan
Factsheet, English, 5 pages

Summary

New construction and Renovation Works. To cater for the ever increasing number of returning students, the project of SDC provided to replace Block A, which was in poor condition, with a new two storey structure, corresponding to the Education Departments proven standard design, completed with the necessary equipment and furniture. To ensure the children safe drinking water, the project envisaged to install a rain water harvesting system (RWH) utilising the collected roof water and collecting it in a below water storage tank. Besides the new Two-storey building, SDC also renovated the existing one-storey building and provided a small playgarden at the entrance.

Publication Year

2012

Topic

Construction | Construction Techniques | Reconstruction | Educational buildings

Publication

Download Publication