Alltogethertogether

Retrofitting of the HRC Office Battagram

The layers of the retrofitting

Pakistan 2006–2007 direct action

The layers of the retrofitting

The building in Battagram that SDC selected as Housing Reconstruction Center (HRC) has been constructed 1950 in colonial style. The house has been partially damaged through the October 05 earthquake. The concrete lintels above windows and doors broke. In addition the center wall cracked seriously.

Firstly cracks and gaps were filled with cement mortar. Secondly Iron mesh on both sides of the wall was bolted with steel rods to prevent wall panels and joints from collapsing.